GMP/PRJ/PT18134385
Design, manufacturing/ fabrication and supply of Chiller System and Gas / Gas Exchanger required for Modification in Existing Refrigeration System at Gambat South (GPF-IV)
The pioneer of the natural gas industry in the country, Pakistan Petroleum Limited (PPL) has been a frontline player in the energy sector since the mid-1950s.
Pakistan Petroleum Limited (PPL) has an aggressive exploration program geared to optimize production and replenish reserves.
Pakistan Petroleum Limited (PPL) operates 12 producing fields in Sui, Kandhkot, Adhi, Mazarani, Chachar, Adam, Adam West, Shahdadpur, Shahdadpur West.
Pakistan Petroleum Limited (PPL)’s Corporate Social Responsibility (CSR) programme dates back to the start of PPL’s commercial operations in Sui in the 1950s.
Human Resources (HR) is geared primarily to recruit qualified and suitable staff and develop policies and measures for their professional satisfaction.
Design, manufacturing/ fabrication and supply of Chiller System and Gas / Gas Exchanger required for Modification in Existing Refrigeration System at Gambat South (GPF-IV)