SMMC/SC/154/12
Extension in Closing and Opening Dates
Vibration and piping stress / pulsation analysis to find out the root cause of excessive vibration in AG compressor skid at Adhi Field.
The pioneer of the natural gas industry in the country, Pakistan Petroleum Limited (PPL) has been a frontline player in the energy sector since the mid-1950s.
Pakistan Petroleum Limited (PPL) has an aggressive exploration program geared to optimize production and replenish reserves.
Pakistan Petroleum Limited (PPL) operates 12 producing fields in Sui, Kandhkot, Adhi, Mazarani, Chachar, Adam, Adam West, Shahdadpur, Shahdadpur West.
Pakistan Petroleum Limited (PPL)’s Corporate Social Responsibility (CSR) programme dates back to the start of PPL’s commercial operations in Sui in the 1950s.
Human Resources (HR) is geared primarily to recruit qualified and suitable staff and develop policies and measures for their professional satisfaction.
Extension in Closing and Opening Dates
Vibration and piping stress / pulsation analysis to find out the root cause of excessive vibration in AG compressor skid at Adhi Field.