Mamikhel Gas Field

Discovery over the Mamikhel structure of Tal block was made in March 2008 through discovery well Mamikhel-1. The well was connected to Manzalai Central Processing Facility to appraise its production potential through Extended Well Testing.

Appraisal well Mamikhel-2 was successfully completed as a gas/condensate producer and commissioned in May 2013.

Current daily production from Mamikhel-1 & 2 is about 23.803 MMscf gas, 664.66 barrels condensate and 5 tonnes LPG. 

Document of Commerciality and Field Development Plan of Mamikhel have been approved by Director General Petroleum Concessions.