Discovery over the Mamikhel structure of Tal block was made in March 2008 through discovery well Mamikhel-1. The well was connected to Manzalai Central Processing Facility to appraise its production potential through Extended Well Testing.

Appraisal well Mamikhel-2 was successfully completed as a gas/condensate  producer and commissioned in May 2013. Document of Commerciality and Field Development Plan of Mamikhel were approved in 2016 by Director General Petroleum Concessions.

Current daily production from Mamikhel-1 & 2 is about 10.01 MMscf gas, 204.42 barrels condensate and 1.28 tonnes LPG* and is processed at MGPF. 

 