Kabir Gas Field

Kabir Gas Field

Kabir X-1 discovery was made in Lower Goru formation at Gambat South Block in May 2015. During initial testing, the well produced 2 MMscfd gas with 250 bbl/d condensate. Quality of gas from Kabir X-1 is good, containing low carbon dioxide (CO2) and nitrogen (N2) contents.

Kabir X-1 has been declared a commercial discovery and is currently processing at Gambat South Processing Facility.

The average daily production from the field between July 2022 and March 2023 was around 1 MMscfd gas and 98 bpd condensate.