Fazl Gas Field
Fazl X-1, the third discovery well from Hala Block, started commercial production in October 2019.
The well is connected to the existing gas processing facility at Hala Block through a 10-km and 6-inch diameter feeder line up to Adam West X-1 well from where the gas is routed to the processing plant.
The field's average daily production from July 2022 to March 2023 was around 8 MMscfd gas and 26 bpd condensate.