Adam West is the second discovery in Hala Block made from the third exploratory well Adam West X-1 drilled in 2014. During Completion Integrity Testing, the well flowed good quality gas at a steady rate of 23 MMscfd with 40 bpd condensate.

The well was put on early production through tie-in to Hala Plant with 13 km x 6” flowline and necessary piping modifications as well as raw gas metering arrangements to sale gas to SSGCL.

The field's average daily production from July 2022 to March 2023 was around 3 MMscfd gas and 6 bpd condensate.