Shahdad X-1 is the second discovery after Wafiq X-1 in Gambat South Block.

The discovery well, Shahdad X-1, was drilled between March and August 2013 to test the hydrocarbon potential of Massive Sand of Lower Goru Formation. During testing, the well flowed up to 27.1 MMscfd gas and 255 bpd condensate.

The well is under production since September 9, 2015 and producing at an average rate of 7.29 MMscfd gas and 78.98 bpd condensate. * '

The Government of Pakistan approved the Field Development Plan for Shahdadpur West Field, declaring commmerciality of its production on March 15, 2017.