PD/GS/GPF-III/001/2015
Setting up of Gas Processing Facility (GPF-III) at Gambat South block on Engineering, Procurement, Construction and Commissioning (EPCC) basis
(Value PKR 5,000/- or USD 50/-)
The pioneer of the natural gas industry in the country, Pakistan Petroleum Limited (PPL) has been a frontline player in the energy sector since the mid-1950s.
Pakistan Petroleum Limited (PPL) has an aggressive exploration program geared to optimize production and replenish reserves.
Pakistan Petroleum Limited (PPL) operates 12 producing fields in Sui, Kandhkot, Adhi, Mazarani, Chachar, Adam, Adam West, Shahdadpur, Shahdadpur West.
Pakistan Petroleum Limited (PPL)’s Corporate Social Responsibility (CSR) programme dates back to the start of PPL’s commercial operations in Sui in the 1950s.
Human Resources (HR) is geared primarily to recruit qualified and suitable staff and develop policies and measures for their professional satisfaction.
Setting up of Gas Processing Facility (GPF-III) at Gambat South block on Engineering, Procurement, Construction and Commissioning (EPCC) basis
(Value PKR 5,000/- or USD 50/-)